IMG_0647

For the Miller project by Sarona WI we built our SR-18 masonry heater core system with our white oven and a front and side heated bench with the chimney on the side.  The heater was finished with a 4″ solid CMU base for a Montana ledgestone thin veneer facing and a 2″ NY Bluestone stone hearth.

Mike and Jake capping the heater core.

Finished masonry heater core.

4″ CMU and Chimney being installed.

CMU and heated bench being installed with connection to chimney on the side.

Rear Facing white oven